The Challenge:

HGM were engaged to carry out the civil site works for the installation of an on-site waste water servicing system for the public toilets at the Barracks site at Godley Head

The Solution:

A peat bed system was installed that consisted of a sceptic tank with a flout at the toilet block which then ran through a 24m2 peat bed and a second flout chamber before being discharged through a series of discharge seepage trenches. All work was completed in line with resource consent conditions and criteria set by DOC and all pipelines where pressure tested and inspected by CCC before the system was commisioned.

This project was well suited to HGMs wide variety of plant and equipment and HGM were able to assist in carrying out various maintenance and clean up jobs around the area, leaving the site in immaculate condition.

Location

Godley Head, Christchurch

Client

Department of Conservation

Date

July 2013

Duration

3 weeks (July 2013)

Strong reputation for practical and reliable solutions

From steep hill stabilisation to remote backcountry builds, from power infrastructure to recreation spaces — we specialise in complex, high-risk, technically demanding projects across Canterbury and the wider South Island.

Our services

Power Infrastructure

Power Infrastructure

Recreation Construction

Recreation Construction

Bridge Construction & Maintenance

Bridge Construction & Maintenance

Piling

Piling

Design, Build, and Project Management

Design, Build, and Project Management

Slope Retention

Slope Retention

Marine Services

Marine Services

Timber & Concrete Structures

Tower & Pole Erections

Well Capping

Well Capping

Excavation & Siteworks

Excavation & Siteworks