HGM were engaged to install 3 foundations and stand the new poles for a new Selwyn River crossing that Connetics were completing as part of the Orion NZ Ltd network. The contract consisted of 3 x 1,500mm diameter steel cased reinforced concrete foundations to 8/9 metres depth as well as the standing of the new 15 and 25 metre tall poles.