Project Description

HGM were engaged to install 3 foundations and stand the new poles for a new Selwyn River crossing that Connetics were completing as part of the Orion NZ Ltd network. The contract consisted of 3 x 1,500mm diameter steel cased reinforced concrete foundations to 8/9 metres depth as well as the standing of the new 15 and 25 metre tall poles.

Project Solution

The large diameter permanent casings were driven using a 35t excavator with a hydraulic vibration attachment. These were then cleaned out to the desired depth with an auger followed by the installation of the steel reinforcing cages that HGM had supplied and tied in our yard. The casings were then trimmed on site to 200mm below ground level before being back filled around.

HGM also lifted and positioned the new poles in to place with a crane and bolted them in to place.

The site was left tidy with the Farmer’s fences reinstated and all project stakeholders were happy with the outcome.

 

Location

Selwyn River, Highfield Rd, Dunsandel

Client

Connetics

Date

2023

Strong reputation for practical and reliable solutions

From steep hill stabilisation to remote backcountry builds, from power infrastructure to recreation spaces — we specialise in complex, high-risk, technically demanding projects across Canterbury and the wider South Island.

Our services

Power Infrastructure

Power Infrastructure

Recreation Construction

Recreation Construction

Bridge Construction & Maintenance

Bridge Construction & Maintenance

Piling

Piling

Design, Build, and Project Management

Design, Build, and Project Management

Slope Retention

Slope Retention

Marine Services

Marine Services

Timber & Concrete Structures

Tower & Pole Erections

Well Capping

Well Capping

Excavation & Siteworks

Excavation & Siteworks